The height of the installation of a gas boiler from the floor

Installation of a wall gas boiler standards

The requirements for the installation of a gas boiler are needed because gas is a combustible and explosive substance. Observing the necessary rules and requirements, you will protect yourself from troubles.

How not to make a mistake with the height of the installation of a gas boiler? Initially, my gas boiler was installed at an altitude of 1.5 meters, due to the fact that it was planned to place a boiler room under a gas boiler. Subsequently, I had to outweigh the indicated by the gallows to the height, so to start fighting the windmills at the end of December did not enter the plans.

Natural Gas Boiler replacement (Honest Jardys plumbing)

A runaway search on the Internet will say that there are some figures for the height of the boiler installation, but there are those who say that you can hang at any height, but according to the manufacturer’s instructions.

So all (or almost all) issues with gas equipment, including gas boilers, are regulated by the joint venture. From there, and specifically from SP-42-101-2003 “General provisions for the design and construction of gas distribution systems”, gas workers and the installation of a gas boiler, regardless of its purpose and type (with a closed combustion or open).

Specifically, general provisions paragraph 10.223, which reads:

Ten.223 running water heaters are attached to the walls on pendants. Metal strips knocked in the walls on a cement mortar.The distance from the floor to the burner of the water heater is recommended to take 90. 120 cm.

Http: // files.Stroyinf.Ru/DATA1/40/40511/

This is where the catch is. Why is my purchased gas boiler with a closed combustion chamber should be hanged at a height indicated for the water heater? Indeed, in the documentation for the boiler there is no word about the “water heater”:

Wall.Mounted gas heating boiler Vaillant, certificate of conformity

In my case, at the first visit of the master doing the project and subsequent work, the gas boiler was already hanging at the desired height, 1.5 meters from the floor, but was not tied. First of all, the master called the boss, it was heard what they say in response, knowing all the tricks of people from the branch of hell, did not refuse to “listen” and heard:

Master (m):.The boiler hangs higher than necessary, at an altitude of 1.5 meters. Do you need to outweigh it?

Head (H):.They have already tied him?

M:.No, hangs on the wall with a coaxial pipe

N:.Well then let them outweigh.

As I wrote at the beginning, the gas boiler had to be outweighed to the required height. Thus or get ready to prove that “not a camel” or hang on a height according to SP-42-101-2003, which in paragraph 10.223 recommends installation at an altitude of 90-120cm from the floor. But we, as you know, have everything that is recommended, must be executed.

The height of the installation of a gas boiler from where?

How not to make a mistake with the height of the installation of a gas boiler? Initially, my gas boiler was installed at an altitude of 1.5 meters, due to the fact that it was planned to place a boiler room under a gas boiler. Subsequently, I had to outweigh the indicated by the gallows to the height, so to start fighting the windmills at the end of December did not enter the plans.

A runaway search on the Internet will say that there are some figures for the height of the boiler installation, but there are those who say that you can hang at any height, but according to the manufacturer’s instructions.

So all (or almost all) issues with gas equipment, including gas boilers, are regulated by the joint venture. From there, and specifically from SP-42-101-2003 “General provisions for the design and construction of gas distribution systems”, gas workers and the installation of a gas boiler, regardless of its purpose and type (with a closed combustion or open).

Specifically, general provisions paragraph 10.223, which reads:

This is where the catch is. Why is my purchased gas boiler with a closed combustion chamber should be hanged at a height indicated for the water heater? Indeed, in the documentation for the boiler there is no word about the “water heater”:

Wall.Mounted gas heating boiler Vaillant, certificate of conformity

In my case, at the first visit of the master doing the project and subsequent work, the gas boiler was already hanging at the desired height, 1.5 meters from the floor, but was not tied. First of all, the master called the boss, it was heard what they say in response, knowing all the tricks of people from the branch of hell, did not refuse to “listen” and heard:

Master (m):.The boiler hangs higher than necessary, at an altitude of 1.5 meters. Do you need to outweigh it?

Head (H):.They have already tied him?

M:.No, hangs on the wall with a coaxial pipe

N:.Well then let them outweigh.

As I wrote at the beginning, the gas boiler had to be outweighed to the required height. Thus or get ready to prove that “not a camel” or hang on a height according to SP-42-101-2003, which in paragraph 10.223 recommends installation at an altitude of 90-120cm from the floor. But we, as you know, have everything that is recommended, must be executed.

Block: 2/3 | Summer characters: 2138

Initial work

Before starting repair work on the commissioning of equipment, it is necessary to collect a number of documents allowing such work:

  • Gas supply agreement.
  • The scheme of the heating system and the terms of technical election with equipment settings approved in the corresponding authorities.
  • Official consent of the gas inspector for work.

Often it happens that setting up a gas boiler in a private house takes less time and effort than preparation of documentation and commissioning.

How to install a gas wall boiler correctly. Norms and rules for installing a hinged boiler on gas

Construction standards and rules for installing hinged gas boilers are described in SNiP 31-02-2001. And also, amendments from 26.05.2004 and SP 42-101-2003.Related to the location m, the requirements of fire and operational safety, the indicated regulatory documents describe the general provisions.

Security. The state of security of the vital interests of the individual, society and the state from internal and external threats. ;. Lack of unacceptable risk associated with the possibility of damage. Note: In the field of standardization, the safety of products, works (processes) and services is usually considered in order to achieve the optimal balance of a number of factors, including non.Lactic factors as human behavior that allow you to reduce the risk associated with the possibility of environmental damage, human health and preservation of property to an acceptable level. (GOST R 1.0-92, state standard P 51110-97)

Building regulations. The normative document in the field of construction, adopted by the executive body and containing mandatory requirements. Construction standards and rules are a special case of technical regulations. (SNiP 10-01-94)

height, installation, boiler, floor

The assembly manufacturer attached to the factory, additional instructions, regarding installation work, are contained in the installation guide. In this regard, to start the installation of a wall heating boiler on your own. It requires you to fulfill several prerequisites:

  • Documents are submitted for approval to the bodies of the Gaunadzor, make approval. In the future after the manufacture of the project and obtaining technical conditions. If everything is in order, a permit for installation is issued.
  • Get the technical conditions for installation. In the gas service, they must check the possibility of connecting the heating unit to the central highway.
  • Make a project.With the exception of situations when the heat generator changes to identical in power and model, the need for an installation project exists in each case.

Heating. Maintaining in closed rooms of a normalized temperature with an average of 50 hours. (SNiP 2.04.05-91)

height, installation, boiler, floor

Model. Product, which is a three.Sized simplified image of an object on a established scale. The model is an integral part of the layout. (GOST 2.002-72)

Project. Design and estimate documentation developed for a particular object in accordance with the requirements of construction standards and rules for pores. Development, coordination and approval of design and estimate documentation. (SNiP 3.01.01-85)

Specifications. A document establishing the technical requirements that the products, process or service must satisfy. (SNiP 10-01-94)

In the future, after receiving the results of approval, you can proceed to the installation of a wall gas heating boiler on your own. In order for work to go through the least violations, take into account several current requirements related:

At what height to hang a gas boiler on the wall

In accordance with the instructions, the minimum distance to the floor from the lower part of the case should not be less than 80 cm. The minimum installation height is determined by the distance from the chimney channel. When determining the location of the boiler, take into account another parameter.At a minimum, for two diameters of the chimney, the requirements stipulate that the boiler must be lowered down. Often. The heat generator is installed from 0.8 to 1.8 from the floor level.

Fire safety during installation of a hinged boiler

When installing a wall gas boiler, fire safety requirements are presented. Minimum fire breaks are provided:

Fire safety requirements. Special conditions for the social and (or) technical nature established in order to ensure fire safety by the legislation of the Russian Federation, regulatory documents or the authorized state body.

Unit. 1) the result of enlargement (“aggregation”) of information; 2) the value characterizing the economic activity of the company and is a generalizing result of individual simple operations carried out by various subjects of the economy. At the macroeconomic level, generalizing indicators are displayed by adding balance sheets reflected in the system of national accounts. They are consolidated statistical characteristics of the general state of the economy.

On the wall, under a gas boiler, fire safety rules indicate the need to establish a thermal insulation shield. When connecting the chimney and the pipe through the roof, and the floor slabs, fire breaks are provided.

height, installation, boiler, floor

Fire safety rules. Set of provisions setting pores. Compliance with the requirements and standards of fire safety during the construction and operation of the facility. (GOST 12.One.033-81)

With a high degree of fire resistance, between the room used under the boiler room and living rooms, a partition of non.Combustible materials is installed. Completely rubber hoses or protected by a metal braid, prohibited. When connecting to the pipeline, a corrugated metal pipe is used.

How and how to finish the walls behind a gas boiler

When installing a wall boiler used for the ceiling, the requirements for finishing materials are separately stipulated.Staining with water.Based paints, it is allowed to install gypsum accommodation or drywall plates, followed by alignment with plastering mixtures and putty.When facing, use plastic, glue the ceiling with wallpaper, in accordance with existing standards, is prohibited.

Placement of the heat generator, the requirements for the room

For the room in which gas equipment will be located, there are strict requirements:

  • It is not allowed to install a heating unit operating on a gas in the bathroom or in the living area of ​​the house. It is allowed to have equipment in the kitchen or other non.Residential premises. Installation on any floor of the building is allowed. But the outer extension or even a separate boiler room is best for gas equipment.
  • It is allowed to install a heating system only in rooms with a ceiling height of at least two meters and an area of ​​at least 7.5 square meters.M.
  • Be sure to have windows overlooking the street.
  • It is necessary to think over the supply and exhaust ventilation of the room. If the heat generator is placed in the kitchen, then the window for ventilation is suitable.
  • The panel of the suspension boiler should be located at a distance of at least 125 cm from the walls or other items.
  • In the kitchen, it is allowed to install a gas unit with a capacity of up to 60 kW, in extensions and corridors. Up to 150 kW. The maximum power is not provided for the outer boiler room.

Installation of a gas boiler in combined kitchens

In modern construction, the arrangement of studios or layouts is actively practiced, in which the living room and kitchen are combined into one large space. Of course, such a solution has a lot of advantages. For example, a majority of free space appears, which is perfect for the implementation of all kinds of design ideas.

The problem is that such layouts are regarded as residential gas services, so the installation of any gas equipment is prohibited in them. This problem cannot be solved in the studios, but when combining a living room with a kitchen, options are possible.

So, it is quite possible to name the premises “kitchen-dining room” in the process of paperwork. Thanks to this name, the united room will not be considered residential, so it can safely install a gas boiler in it. Another option is the installation of a sliding partition between the rooms or the complete renewal of all assuring the papers.

The location of the gas boiler

The gas boiler in the apartment is usually placed in the kitchen, which is determined by the presence of all the necessary communications, and the distance from the gas pipe to the boiler is withstanding without problems. As a rule, wall.Mounted boilers are used for apartments, which are attached to the walls using special brackets that are complete with equipment.

If the house has a staircase leading to the top floor, the hosts have a desire to install a boiler under it. As a rule, the volume of space under the stairs is enough for the boiler, but there are problems with ventilation, so it has to be equipped separately using large diameter pipes.

Preparatory events

Preparation for the installation of a gas boiler in a private house begins with the study of regulatory requirements, the rules for installing a gas boiler in a private house, design solutions to arrange auxiliary equipment, technical characteristics and internal device of the boiler unit.

For permission to connect the heating boiler to the gas pipeline and supplying a gaseous supply to the residential building, the owner of the building must submit an appropriate application to the local gas service, where the request will be considered by specialists within a month.

After that, the applicant issues technical conditions for connecting or a motivated refusal until the existing remarks are completely eliminated. The installation of a gas boiler without obtaining and fulfilling technical conditions is considered illegal and may entail the responsibility of the owner of the house, the level of which is determined by the consequences of the deed.

The project of individual furnace is developed taking into account all technical requirements and rules set in conditions. The heat losses of the building are calculated and the power of the boiler is determined taking into account the consumption of hot water for household needs.

How to Prevent Laundry Room Flooding | Ask This Old House

The finished project must be agreed in the special service for the supervision of a gas supply organization. To do this, in a place with him to the regulatory authority is sent:

  • Technical passport of the boiler;
  • Instructions for the manufacturer for the installation and operation of the heating unit;
  • A copy of the certificate for its compliance with the current regulatory documents.

The next stage of work is to equip equipment and the necessary materials

Here you should pay attention to the compliance of connecting fittings in size and thread step for the response of the boiler, pumps, tanks and other equipment provided for by design solutions

It must be understood that the equipment is part of the heating system and should not be considered as a separate isolated area of ​​the house.

You asked, we answer

Despite the large amount of information available, many questions arise for users related to installation, the subsequent launch of gas boilers.

How to install the device in a wooden house correctly. Are there special standards

Installation of a gas boiler in a wooden house can be carried out subject to a number of norms and rules.

  • The installation of a gas boiler in the basement (basement) of a tree made of wood is prohibited;
  • For the boiler room, it is necessary to highlight a separate room where there is natural light, ventilation;
  • The size, height of the ceilings meet the requirements;
  • Staying in living rooms (kitchen-living room), agricultural c/a is prohibited;
  • Eliminate contact of the boiler with wooden surfaces;
  • The location zone of the boiler is perfectly flat, faced with non.Combustible material, between the wall and the back wall the presence of a layer of asbestos;
  • Personal fire extinguishing equipment are in close proximity to gas equipment.

Exclude the independent launch of the boiler. This is possible only if there are permissive documents and in the presence of specialists of the company supplies gas to homebuilding.

height, installation, boiler, floor

At what distance you can install a socket

Modern energy.Dependent boilers have a strictly regulated cord and outlet. It is forbidden to use extension cords. The electric cord should calmly, without tension, get to the nearest current source. It is also regulated by regulatory documents. Distance not more than 50 cm. It looks approximately as shown in the figure.

What should be the doors

What should be the parameters of the boiler room and its entrance doors already mentioned above. It will not be superfluous to remind. Door width from 80 cm. It opens out. At the bottom, the presence of a small slice is mandatory, which to ensure the normal functioning of natural ventilation. The presented scheme will help with the answer to this and many other questions.

It is not worth considering that own knowledge is enough for independent installation of gas equipment. In order not to have problems with the launch, obtaining permits, it is better to coordinate the purchase of equipment for a boiler room or other premises with a company that supply blue fuel. Get a project for installation. This is important, since even a new boiler may not correspond to the power of the gas distribution network.

| Denial of responsibility | Contacts |RSS